What
to expect: Before, During & After
your extruded concrete landscape curbing installation
Before:
1. If desired, A Cutting Edge Curbing Estimator / Designer
can meet with you at your home to review your proposed curbing project
area. We'll supply you with our knowledge and ideas and work with
you to come up with the best design layout possible. We will paint
then measure your area and give you a written estimate. You schedule
the job when you want it done. There's no pressure from the estimator
that comes out to your jobsite. We are the best!
2. Please keep sprinklers, in the area, off for 2 days prior
to your installation date and please pick up after your pets before
we arrive.
3. Landscape curbing is best installed prior to the installation
of irrigation lines, but not absolutely necessary. (Our
landscape contractor customers always have us come in prior to trenching
so that sprinkler heads can be installed right up against the wall
of the curbing and so appropriate coverage areas can be determined.)
4. Please provide access to your job site and keep pets indoors
for the duration of the installation.
5. Ensure that all ground work or boulder placement has occurred
prior to our crew's arrival for installation.
6. Be sure to plainly mark all sprinkler heads and lines,
telephone wires, cable TV, or other buried items. Cutting Edge Curbing
is not responsible for any damage by our crew or equipment to any
buried items or to unmarked sprinklers.
During:
1. The curbing crew will install your beautiful new curbing
using the highest quality materials and equipment. ½ inch polypropylene
fiber mesh is added to every batch of concrete mix for significant
added strength and stability.
2. Color is added into the concrete mix and is measured precisely
for a consistent color throughout the project. Actual finished color
is close to the color chart but there will be variation in every
project.
3. Crews make efforts to keep and leave the jobsite clean
and neat. During the process some excess concrete may be present
around the areas installed, especially at starts/stops and corners.
It is very difficult to remove this concrete while it is still wet.
After a 24-hour curing period it can be picked up in small pieces
and thrown away or crushed by foot and mixed with topsoil. Since
the curbing crew does not include a return trip in the price of
the cubing to do this, we apologize in advance for any type of mess
left immediately after installation.
4. At the completion of your installation a measuring wheel
is used to get an accurate footage count. The measuring is done
outside the curb line for safety.
After:
1. Your extruded curbing is set to cure upon completion of
the project. The concrete curb does not need to be sprayed or misted
with water. Such actions will most likely discolor the curb and
claims for discolored or wrong colored curb will be denied. The
curb will not "fall apart" or "crumble" after
we have left the jobsite. It is perfect, but vulnerable, when we
leave. Make sure your neighbors and family members stay away from
the curbing after we have left. The most curious of neighbors will
approach your curb within minutes of our crew's departure. Protect
your curb.
2. Keep Sprinklers off for at least 2 days following the
installation. Excess moisture on or around the curbing will affect
the normal curing process. Any excess water around the curbing
will hamper the curing process and give it a permenant blotchy look.
If it begins to rain within 8 hours after we leave the job, try
to cover the curb with plastic. Make sure sprinkler systems are
not activated for at least 48 hours. Irrigation, backwash from
pool, condensation lines, or rain can damage the curb during the
first 48 hours.
3. Take extra precaution to keep pets, children, vandals
and objects away from the curb for at least 24 hours. It will be
"hard" to the touch at this point, but will still need a few days
to completely harden. The curb is like a "sandcastle". Refrain from
testing the "hardness" of the curb.
4. During the first 48 to 72 hours you should avoid direct
sprinkler impact on the curbing. Keep water away from curb for 48-72
hours. After 24 hours a mist would not cause any immediate damage,
but a sprinkler within a couple of feet could create some pitting
in your new edging. And the water itself will discolor your curb.
5. Sprinkler work and landscape work may be started
48 hours after installation; however, caution must be taken as shovels,
picks and wheelbarrows can damage the curb for several days while
it is fully curing.
6. If you have a landscape contractor or other trade professional
working for you, caution them about protecting the curb from damage.
If wheelbarrows are used for hauling rock over the curb, put a mound
of dirt over it (6" over and 12" on each side) or build a ramp
over the curb to keep the weight from cracking it. Never allow a
tractor, truck, or any other equipment to run over the curb. Cutting
Edge is not responsible for the damage to curbing resulting from
any type of traffic.
7. If your curb is damaged after the installation crew has
left, we will come back and make the necessary repairs; however,
there is a $75.00 minimum charge for this service. We will do the
best job possible on this repair, however repairs rarely look as
good as the initial extruded installation.
8. During the first 7 days you ought to keep lawn mowers
off your curbing. The wheels will probably not damage the curbing,
but the metal corners on your lawn mower may scratch or otherwise
damage the product during its curing period.
9. During the next couple of weeks you will need to take
extra precautions not to damage your curbing. Items such as rakes,
shovels, and other gardening tools need to be used with caution
near the curbing during this curing period.
10. Efflorescence
(white powder substance) is not covered under warranty since
it is a natural occurrence. It can appear on occasion and does not
look good on curbing. It can appear after a rainstorm or if there
is moisture in the ground around the curbing. It happens mostly
in the Fall and Winter months and due to the ambient tempratures
and moisture in the air. It is not the result of our materials or
workmanship. The intensity of the efflorescence
varies depending upon the type (hardness) of water and volume
of water that gets on the curb or amount of salts in the adjacent
soils and/or the amount of moisture in the air. Check your sprinkler
heads while the system is on and adjust them to minimize the amount
of water spraying directly on the curb. If you have just planted
sod and are watering frequently, efflorescence
may appear more readily. Be patient, wait for your lawn to get established
and clean the curb after it dries. A solution of 50/50 vinegar and
water with a light brushing will remove
the efflorescence. You may have to do this a few times; eventually,
the efflorescence should go away.
11. Some fertilizers and chemicals will
stain the curbing as they would any other concrete product. You
should alert those doing the fertilizing to avoid
spraying their product on the curbing. If you feel they might
have sprayed the concrete, you may wish to hose it down shortly
after they have finished spraying.
12. Curbing with color in it may look "splotchy" for up to
30 days while it is curing. This will go away as it cures and is
not to be confused with efflorescence. Concrete is darker in color
when it is first laid due to the water content and will lighten
up as it dries and cures. After about 30 days, and when the curb
is fully dry, your curb will have a more uniform look to it. Although
it may take longer due to excess moisture and watering of the lawn.
13. Cracking - Concrete curbing like any other type of concrete
can and will crack. We try to control the cracking with expansion
joints every two to four feet. If cracking does occur, it should
be in the expansion joint. We experience very little cracking in
our products; however, if there are any solid cracks out of the
joint (over 1/8"), we will replace the damaged area during the warranty
period. A warning, however, is important to note: Repairs can
be difficult to make in colored concrete. It is impossible to get
a perfect color match. Sometimes the "solution is worse than the
problem". A hairline crack is much less noticeable than a patch
or discoloration in the curbing.
Warranty
Information
Your
curbing has a one-year warranty against defects in materials
and workmanship. Any areas in question will be replaced or repaired
at no charge if the materials we used or the manner of installation
by our workmen caused the defect.
A
few of the items not covered:
1.
Any cracking in the curbing due to settlement of the ground beneath
the curbing is not covered. Cracks must be wide enough to slip a
quarter down into the curb for the replacement of that section to
be warranted
2. Cracking or breakage occurring due to driving over the
curb with any vehicles or equipment is not covered.
3. We do our best to make sure that the color is true throughout
your curbing; however, we cannot guarantee that the curb will match
perfectly throughout the entire job. The color of your curb is a
close representation of our color chart and will not be a perfect
match. Due to the variation in a color pigment products used to
color concrete there will be a slight difference in color across
the curb when finished. Stamped and Embossed Colors will vary from
job to job.
4. For Stamped and Embossed products: Customers should expect
some fading, color variation, and spider cracking of the product
due to the nature of the stamping and embossing process.
5. No color claims will be accepted if sprinklers are left
on or turned on 2 days prior to or 2 days after installation. This
excess jobsite moisture will adversely effect the color of your
finished curbing project and is not covered under warranty.
Tell tale signs including washed out color, blotchy color and /or
abnormally light or dark areas are a direct result of excess moisture
at the jobsite and no claims can be honored if such is evident.
6. There will be a color variation relative to the color
chart you chose your color from. Any variation of the color chosen
is acceptable. Claims of wrong color or no color in curb can only
be evaluated after 30 days have past.
7. Efflorescence of any kind is
not covered. It must be washed away with a solution of 50/50
vinegar and water using a light brushing and thorough rinse. Cutting
Edge has no control over the appearance
of efflorescence.
Thank
you for choosing Cutting Edge Curbing. We're the best Landscape
Curbing Company in Arizona. We know you will enjoy your curbing
project for years to come. If you have any questions regarding our
curbing please call us.
|