What to Expect: Before, During & After Your Extruded Concrete Landscape Curbing Installation
Before:
1. If desired, A Cutting Edge Curbing Estimator
/ Designer can meet with you at your home to review your proposed
curbing project area. We'll supply you with our knowledge and ideas
and work with you to come up with the best design layout possible. We
will paint then measure your area and give you a written estimate.
You schedule the job when you want it done. There's no pressure from
the estimator that comes out to your jobsite. We are the best!
2.
Please keep sprinklers, in the area, off for 2 days prior to your
installation date and please pick up after your pets before we
arrive.
3. Landscape curbing is best installed prior to
the installation of irrigation lines, but not absolutely
necessary. (Our landscape contractor customers
always have us come in prior to trenching so that sprinkler heads can
be installed right up against the wall of the curbing and so
appropriate coverage areas can be determined.)
4.
Please provide access to your job site and keep pets indoors for the
duration of the installation.
5. Ensure that all ground
work or boulder placement has occurred prior to our crew's arrival
for installation.
6. Be sure to plainly mark all sprinkler heads and lines, telephone wires, cable TV, or other buried items. Cutting Edge Curbing is not responsible for any damage by our crew or equipment to any buried items or to unmarked sprinklers.
During:
1. The curbing crew will install your beautiful new
curbing using the highest quality materials and equipment. ½ inch
polypropylene fiber mesh is added to every batch of concrete mix for
significant added strength and stability.
2. Color is
added into the concrete mix and is measured precisely for a
consistent color throughout the project. Actual finished color is
close to the color chart but there will be variation in every
project.
3. Crews make efforts to keep and leave the
jobsite clean and neat. During the process some excess concrete may
be present around the areas installed, especially at starts/stops and
corners. It is very difficult to remove this concrete while it is
still wet. After a 24-hour curing period it can be picked up in small
pieces and thrown away or crushed by foot and mixed with topsoil.
Since the curbing crew does not include a return trip in the price of
the cubing to do this, we apologize in advance for any type of mess
left immediately after installation.
4. At the completion of your installation a measuring wheel is used to get an accurate footage count. The measuring is done outside the curb line for safety.
After:
1.
Your extruded curbing is set to cure upon completion of the project.
The concrete curb does not need to be sprayed or misted with water.
Such actions will most likely discolor the curb and claims for
discolored or wrong colored curb will be denied. The curb will not
"fall apart" or "crumble" after we have left the
jobsite. It is perfect, but vulnerable, when we leave. Make sure your
neighbors and family members stay away from the curbing after we have
left. The most curious of neighbors will approach your curb within
minutes of our crew's departure. Protect your curb.
2.
Keep
Sprinklers off for at least 2 days following the installation. Excess
moisture on or around the curbing will affect the normal curing
process.
Any excess water around the curbing will hamper the curing process
and give it a permenant blotchy look. If it begins to rain within 8
hours after we leave the job, try to cover the curb with plastic.
Make
sure sprinkler systems are not activated for at least 48 hours.
Irrigation, backwash from pool, condensation lines, or rain can
damage the curb during the first 48 hours.
3.
Take
extra precaution to keep pets, children, vandals and objects away
from the curb for at least 24 hours. It will be "hard" to
the touch at this point, but will still need a few days to completely
harden. The curb is like a "sandcastle". Refrain from
testing the "hardness" of the curb.
4.
During the first 48 to 72 hours you should avoid direct sprinkler
impact on the curbing. Keep water away from curb for 48-72 hours.
After 24 hours a mist would not cause any immediate damage, but a
sprinkler within a couple of feet could create some pitting in your
new edging. And the water itself will discolor your curb.
5.
Sprinkler work and landscape work may
be started 48 hours after installation; however, caution must be
taken as shovels, picks and wheelbarrows can damage the curb for
several days while it is fully curing.
6.
If you have a landscape contractor or other trade professional
working for you, caution them about protecting the curb from damage.
If wheelbarrows are used for hauling rock over the curb, put a mound
of dirt over it (6" over and 12" on each side) or build a
ramp over the curb to keep the weight from cracking it. Never allow a
tractor, truck, or any other equipment to run over the curb. Cutting
Edge is not responsible for the damage to curbing resulting from any
type of traffic.
7.
If your curb is damaged after the installation crew has left, we will
come back and make the necessary repairs; however, there is a $75.00
minimum charge for this service. We will do the best job possible on
this repair, however repairs rarely look as good as the initial
extruded installation.
8.
During the first 7 days you ought to keep lawn mowers off your
curbing. The wheels will probably not damage the curbing, but the
metal corners on your lawn mower may scratch or otherwise damage the
product during its curing period.
9.
During the next couple of weeks you will need to take extra
precautions not to damage your curbing. Items such as rakes, shovels,
and other gardening tools need to be used with caution near the
curbing during this curing period.
10.
Efflorescence
(white powder substance) is not covered under warranty since it
is a natural occurrence. It can appear on occasion and does not look
good on curbing. It can appear after a rainstorm or if there is
moisture in the ground around the curbing. It happens mostly in the
Fall and Winter months and due to the ambient tempratures and
moisture in the air. It is not the result of our materials or
workmanship. The intensity of the efflorescence
varies depending upon the type (hardness) of water and volume of
water that gets on the curb or amount of salts in the adjacent soils
and/or the amount of moisture in the air. Check your sprinkler heads
while the system is on and adjust them to minimize the amount of
water spraying directly on the curb. If you have just planted sod and
are watering frequently, efflorescence
may appear more readily. Be patient, wait for your lawn to get
established and clean the curb after it dries. A solution of 50/50
vinegar and water with a light brushing will remove
the efflorescence. You may have to do this a few times;
eventually, the
efflorescence should go away.
11.
Some fertilizers and chemicals will
stain the curbing as they would any other concrete product. You
should alert those doing the fertilizing to avoid
spraying their product on the curbing. If you feel they might
have sprayed the concrete, you may wish to hose it down shortly after
they have finished spraying.
12.
Curbing with color in it may look "splotchy" for up to 30
days while it is curing. This will go away as it cures and is not to
be confused with efflorescence. Concrete is darker in color when it
is first laid due to the water content and will lighten up as it
dries and cures. After about 30 days, and when the curb is fully dry,
your curb will have a more uniform look to it. Although it may take
longer due to excess moisture and watering of the lawn.
13. Cracking - Concrete curbing like any other type of concrete can and will crack. We try to control the cracking with expansion joints every two to four feet. If cracking does occur, it should be in the expansion joint. We experience very little cracking in our products; however, if there are any solid cracks out of the joint (over 1/8"), we will replace the damaged area during the warranty period. A warning, however, is important to note: Repairs can be difficult to make in colored concrete. It is impossible to get a perfect color match. Sometimes the "solution is worse than the problem". A hairline crack is much less noticeable than a patch or discoloration in the curbing.
Warranty Information
Your curbing has a one-year warranty against defects in materials and workmanship. Any areas in question will be replaced or repaired at no charge if the materials we used or the manner of installation by our workmen caused the defect.
A
few of the items not covered:
1.
Any
cracking in the curbing due to settlement of the ground beneath the
curbing is not covered. Cracks must be wide enough to slip a quarter
down into the curb for the replacement of that section to be
warranted
2.
Cracking or breakage occurring due to driving over the curb with any
vehicles or equipment is not covered.
3.
We do our best to make sure that the color is true throughout your
curbing; however, we cannot guarantee that the curb will match
perfectly throughout the entire job. The color of your curb is a
close representation of our color chart and will not be a perfect
match. Due to the variation in a color pigment products used to color
concrete there will be a slight difference in color across the curb
when finished. Stamped and Embossed Colors will vary from job to job.
4.
For Stamped and Embossed products: Customers should expect some
fading, color variation, and spider cracking of the product due to
the nature of the stamping and embossing process.
5.
No color claims will be accepted if sprinklers are left on or turned
on 2 days prior to or 2 days after installation. This
excess job site moisture will adversely effect the color of your
finished curbing project and is not covered under warranty.
Tell tale signs including washed out color, blotchy color and /or
abnormally light or dark areas are a direct result of excess moisture
at the jobsite and no claims can be honored if such is evident.
6.
There will be a color variation relative to the color chart you chose
your color from. Any variation of the color chosen is acceptable.
Claims of wrong color or no color in curb can only be evaluated after
30 days have past.
7. Efflorescence of any kind is not covered. It must be washed away with a solution of 50/50 vinegar and water using a light brushing and thorough rinse. Cutting Edge has no control over the appearance of efflorescence.
Thank you for choosing Cutting Edge Curbing. We're the best Landscape Curbing Company in Arizona. We know you will enjoy your curbing project for years to come. If you have any questions regarding our curbing please call us.
![]() | ![]() |
Licensed – Bonded – Insured
![]() ![]() |
"We're the Cutting Edge in Landscape Curbing" Call
to schedule your job today. Arizona
Registrar of Contractors
|
Our
service areas include: Phoenix, Litchfield Park, Scottsdale,
Avondale, Goodyear, Glendale, Buckeye,
Gilbert, Sun City,
Suprise, Chandler, Tempe, Peoria, Mesa, Fountain Hills, Laveen.
Your
Maricopa County, Arizona Landscape Materials and Curbing Company.
© 2001-2011 Cutting Edge Curbing, Inc.
All rights reserved. Website design, Smart Dollar Media